2 March 2022
Scope
When the Tadcaster bridge collapsed during floods, the two parts of the town were separated. We were asked by the main contractor, Balfour Beatty, to provide a temporary lifting solution to assist with the bridge repairs.
Solution
Our solution included the design, manufacture, and installation of four overhead travelling cranes on temporary gantries. The cranes were used to pour concrete for the bridge column repairs.
Result
We were proudly apart of the team that reunited Tadcaster!

Rossendale Group did an exceptional job in difficult circumstances. I would not hesitate to recommend them.”
Tom Fallows | Managing Quantity Surveyor, Balfour Beatty