Case StudyMagnet lifting beam for British SteelLOLERDesign & ManufactureInstallationInspection & Testing
Case StudyDesign, manufacture, installation, test and certification of three jib cranes in UK power stationLOLERDesign & ManufactureInstallationInspection & Testing
Case StudyNew lifting requirements for an upgraded wastewater treatment siteLOLERDesign & ManufactureInstallationInspection & Testing
Case StudyTemporary overhead travelling crane for Tadcaster Bridge repairsDesign & ManufactureInstallation
Case StudyLevelling & load measuring system for Wigis Bridge, Manchester Ship CanalDesign & ManufactureInstallation